1.热风炉炉底漏风的原因:
  1. Reasons for air leakage at the bottom of hot blast stove:
  有些高炉的热风炉可能会存在有一些漏风现象,其漏风的主要原因是热风炉地基钢板密封盖的松动不严密造成。密封盖初期肯定是密封良好的,但后来,由于密封盖上部的浇注料质量问题需进行修补处理。在处理过程中,已经密封在底部的密封盖由于力的不均匀施加而偏移或开裂,导致密封不严。
  There may be some air leakage phenomena in some blast furnaces. The main cause of air leakage is the loose sealing cover of steel plate on the foundation of the blast furnace. The sealing cover must be well sealed in the initial stage, but later, due to the quality of the castable on the top of the sealing cover, it needs to be repaired. In the process of treatment, the seal cap that has been sealed at the bottom is offset or cracked due to the uneven application of force, resulting in improper sealing.
  正常生产后,气体从地基钢板上方的浇注料之间的间隙向下流过密封盖(格子砖之间的间隙向下流过炉排并通过密封盖之间的间隙),然后泄漏出来沿着地基钢板与底部混凝土之间的间隙泄露,造成漏气。
  After normal production, gas flows downward through the sealing cover from the gap between the castables above the foundation steel plate (the gap between the lattice bricks flows downward through the grate and through the gap between the sealing cover), and then leaks out along the gap between the foundation steel plate and the bottom concrete, resulting in leakage.
  2.修补漏气方案要求:
  2. Requirements for repairing air leakage schemes:
  修补炉底漏气处需使用补炉料,一般对补炉料有以下几个要求:
  The repairing burden is needed to repair the leak of the bottom of the furnace. Generally, there are the following requirements for the repairing burden:
  (1)补炉料要有有良好流动性和填充性。
  (1) The feeding material should have good fluidity and filling property.
  (2)补炉料在100-200℃温度下能够顺利固化。
  (2) The refractory can be cured smoothly at 100-200 (?) C.
热风炉生产厂家
  (3)固化时间应适当,好在1-3小时内完全固化。
  (3) Curing time should be appropriate, preferably within 1-3 hours of complete curing.
  (4)固化后有足够强度,应大于热风炉正常运行产生的0.3Mpa热应力。
  (4) The curing strength should be greater than the thermal stress of 0.3 Mpa produced by the normal operation of hot blast stove.
  (5)固化后气密性要好。
  (5) The air tightness is better after curing.
  (6)加热后有尽可能高的固含量。
  (6) The solid content is as high as possible after heating.
  (7)350℃时不会因热解而失去强度。
  (7) The strength will not be lost by pyrolysis at 350 C.
  (8)补炉料要有具有良好的可操作性,无负面影响。
  (8) Repairing burden should have good operability and no negative impact.
  由于补炉料施工工艺与普通浇注料使用方法基本一致,按浇注料使用办法施工即可。
  Because the construction technology of the refractory is basically the same as that of the ordinary castable, the construction can be carried out according to the use method of the castable.
以上内容由热风炉厂家整理发布,更多相关信息可以点击我们的官网进行咨询:http://www.zhongyanjixie.com
More information can be consulted by clicking on our website: http://www.zhongyanjixie.com.

返回顶部

版权所有©山东众焱机械有限公司 备案号:鲁ICP备19005667号-1 服务热线:18005415007 流量统计: